Spike Industrial treats safety as a condition of the work. Crews are expected to stop when the permit, the isolation, or the setup is wrong. Rates and certificates are not posted on this site.

01

Before tools come out

  • Read the scope and the site rules before mobilization
  • Arrive ready for the plant’s orientation and badging
  • Confirm the equipment, the isolation you will be shown, and the lift plan with the plant
  • Wear the PPE the permit requires

02

Permits and energy control

The plant owns the permit and the lockout. Crews apply energy control the way the site procedure requires, including personal locks when that procedure calls for them. They do not remove another person’s lock, and they do not work a machine that has not been turned over.

Hot work, confined space, line breaks, and lifts happen only under the permit the plant issues for that task.

03

Stop-work

Any person on the crew is expected to stop the job when something is unsafe. Work restarts when the condition is corrected and the site contact agrees.

04

Housekeeping and barricades

Barricade the work area, keep the deck clear, and leave the machine and the pad the way the punch list describes. Hoses, leads, and sparks stay inside the permit for that task.